A family-owned agricultural property of approximately 35 hectares seeking a serious long-term partner for practical redevelopment, investment, and management. The site is designed for operators and investors looking at a real project, not a generic property listing.
EXISTING ACCESSinternal routes and agricultural setting
A LARGE AGRICULTURAL PROPERTY. MULTIPLE POSSIBILITIES. A FUTURE TO BUILD TOGETHER.
TERRITORIAL OVERVIEW
A strategic location in the Campidano plain, within a productive agricultural setting and with good connections. The surrounding rural corridor, proximity to the regional capital, and the estate’s historic agricultural identity strengthen its appeal for operational partnerships.
A presentation platform designed for partners and investors
The Zuddas family would like to keep the property within the family while opening a structured dialogue with qualified parties able to invest, manage, and develop the estate seriously. This page summarizes the information currently available, what still needs to be verified, and the collaboration models that appear most relevant.
"The goal is not to find the first interested party, but the right one: a partner able to combine capital, operational capability, vision, and respect for the agricultural context."
35
Indicative hectares
Approximately 85-87 acres based on the information currently available.
2
Main buildings
Potentially reusable as an operational base, service hub, or management presence.
10
Approximate greenhouses
Existing greenhouse structures and agricultural infrastructure to be surveyed in detail.
The base asset
The property at a glance
The information presented here is preliminary. It is intended to support an initial screening of interest and will need to be confirmed through documents, site visits, and professional reviews.
Scale and continuity
A large agricultural holding that appears substantially continuous and readable across historical imagery.
Existing buildings
Two principal buildings and additional supporting structures may provide an initial operational base.
Protected cultivation
Existing greenhouse structures suggest potential for nursery operations, protected crops, or hybrid agricultural models.
Water and irrigation
An irrigation network and at least one reported well have been mentioned. Full functionality must be technically verified.
Access and internal routes
Visible internal access routes may support phased management and more structured operations.
Historic identity
The estate originated as an orange grove and still carries a strong agricultural identity that can support its redevelopment story.
Project directions
Project directions worth exploring
The items below are potential paths rather than pre-approved uses. For a serious investor, the opportunity lies in shaping a coherent project from a property that already has physical structure and agricultural memory.
01
Agricultural and citrus recovery
Selective recovery of the strongest areas, replanting, Mediterranean crops, and a structured productive restart.
02
Nursery and greenhouse production
Development of nursery, ornamental, fruit, or protected cultivation activities, making progressive use of the existing greenhouse stock.
03
Social and educational agriculture
Partnerships with cooperatives, schools, or nonprofit organizations for inclusion, training, and land stewardship.
04
Research, water, and innovation
Pilot work in irrigation, climate resilience, precision agriculture, sensors, biodiversity, and soil regeneration.
05
Compatible rural hospitality
Potential reuse of buildings for hospitality, training, or service activities, subject to planning and regulatory review.
06
Phased mixed-use project
A staged model that combines agricultural recovery, experimentation, and complementary uses under a single direction.
ABCDE
Phased development
A property that can be approached by zones and phases
The estate appears suitable for a phased strategy. An initial phase can focus on the operational core and the most promising production blocks, leaving expansion to later stages.
A
Primary agricultural block
The largest portion of the estate, suited to the main agricultural recovery effort.
B
Operational core
The area of the main buildings and greenhouses, naturally suited as a management and service center.
C
South-western block
A portion that may support a pilot phase, experimentation, or dedicated cultivation.
D
External connection corridor
A linear element useful when considering access, logistics, and service routes.
E
Margins and vegetated edges
Landscape elements relevant for environmental mitigation, biodiversity, and overall quality.
Historical reading
More than twenty years of readable agricultural continuity
The historical imagery suggests a persistent and structured agricultural identity over time. For an investor, this does not replace due diligence, but it helps demonstrate the estate’s long-standing vocation.
2025
Indicative satellite image from 2025. It does not prove productivity, plant health, water availability, or structural compliance.
What the satellite cannot confirm
Satellite imagery does not prove current productivity, crop health, greenhouse legality, real water availability, or planning compliance. All of those points require dedicated technical review.
Potential partners
We are looking for partners able to turn potential into real management
The ideal partner is not simply the party offering the highest fee. We are looking for organizations able to demonstrate experience, capital, governance, operational capability, and a project that fits the context.
Agricultural and citrus operators
Nursery and greenhouse operators
Operator-investors with management capability
Social cooperatives and nonprofit organizations
Universities, foundations, and agri-tech companies
Rural hospitality and wellness operators
Consortium or multi-party groups led by a clear project lead
Collaboration structures
Collaboration models worth evaluating
Long-term agricultural lease
Use and management with clear obligations regarding maintenance, investment, improvement, and return conditions.
Base rent plus variable component
A guaranteed base with an additional performance-linked component supported by transparent reporting.
Partner-funded improvements
Works and infrastructure financed by the partner, with a duration aligned to the investment made.
Pilot project by phases
An initial limited-scope project with milestones before any broader extension.
Multiple coordinated operators
Distinct roles for agriculture, greenhouses, hospitality, or research under a clear governance structure.
Evolving operating partnership
A model that can grow over time, starting from realistic and measurable initial targets.
Process
A structured process before sharing sensitive information
01
Expression of interest
Organization profile, relevant experience, project concept, and preferred area of focus.
02
Initial discussion
Alignment on objectives, timing, investment, management approach, and broad feasibility.
03
Qualification
References, financial capacity, operating plan, guarantees, and identification of responsible parties.
04
Site visit and data room
Progressive access to documents and visits for qualified parties, with confidentiality arrangements if needed.
Location
Explore the indicative project map
The interactive map shows the working perimeter and the surrounding agricultural context. The boundary is not cadastral and must be verified through formal documents and surveys.
The map is provided by Google and is only loaded after your choice.
Load the interactive map
Download the preliminary dossier
The document summarizes the available data, imagery, required verifications, and the first collaboration hypotheses.
The current approach is centered on keeping the property within the family and evaluating long-term collaboration structures. A sale is not the primary positioning of the project.
Are the 35 hectares and the perimeter official?
No. They are preliminary indications based on the materials currently available. Surface area and boundaries must be confirmed through formal records and professional surveys.
Are the suggested uses already authorized?
No. They are project directions only. Any proposal must be assessed from planning, building, environmental, agricultural, hydraulic, and airport-constraint perspectives.
Can a project start with only a portion of the estate?
Yes. A phased pilot project is one of the most sensible models, especially to test operating capability, sustainability, and regulatory compatibility.
What information is available today?
There is already a preliminary dossier, historical satellite imagery, a working map, and initial information on buildings, greenhouses, irrigation, and at least one reported well. Full technical documentation still needs to be assembled and verified.
Can multiple operators participate?
Yes, provided there is clear governance, a lead coordinator, and a precise allocation of roles, investment responsibilities, and risk.
Expression of interest
Tell us who you are and what kind of project you would like to evaluate
An initial contact does not require a full business plan. A profile of the organization, relevant experience, intended use, and a first indication of investment and management capacity are enough.